Service Hotline:0335-7168696
News
News
News

Formwork support system scheme

Time:2022-11-24 14:19:21View count:

The scheme of formwork support system includes preparation of scheme, review and demonstration, and acceptance management.




The preparation of the scheme shall be based on the current relevant national standards and regulations, and the special construction scheme of the formwork support system shall be prepared.




Contents of special construction scheme:




1. Preparation description and basis




2. Project overview




3. Construction plan




4. Construction technology




5. Construction safety assurance measures




6. Workforce plan




7. Calculations and related drawings




Strict review and demonstration: members of expert demonstration meeting; The expert group shall be composed of 5 or more experts who meet the requirements of relevant disciplines; Main contents of expert argumentation; Revise and improve, and organize implementation after approval and signature; The supervision unit shall prepare detailed rules for the implementation of safety supervision.




Acceptance management: Before the erection of the support system, the project technical director shall organize the acceptance of the foundation and foundation to be treated or reinforced, and keep records. The structural materials of the support system are divided into product certificate, production license, inspection report, appearance quality spot check, and fastening torque of fastener bolts. After the erection of the support system, the project leader shall organize the acceptance personnel as the construction unit and the supervision unit.